This project was to install two VRF systems to meet the higher cooling requirements that were not being met by the existing air conditioning systems.

The key to this project was timing as both systems served busy areas where downtime had to be kept to a minimum.  The equipment selected was Mitsubishi Heavy Industries VRF.

Project Details

  • 2 x VRF heat pump systems.
  • 6 x Fan coil units.
  • New power supplies.